Crude oil production
during December 2016 was 3055.07 TMT which is 3.15% and 0.80% lower than target
and production achieved in December 2015 respectively. Cumulative crude oil
production during April-December, 2016 was 27045.34 TMT which is 1.92% and 3.23%
lower than target and production during corresponding period of last year
respectively. Unit-wise and state-wise crude oil production is
given at Annexure-I. Unit-wise crude oil production for the month of December,
2016 and cumulatively for the period April-December, 2016 vis-à-vis same period
of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
|
Oil Company
|
Target
|
December (Month)
|
April-December (Cumulative)
|
||||||
|
2016-17 (Apr-Mar)
|
2016-17
|
2015-16
|
% over last year
|
2016-17
|
2015-16
|
% over last year
|
|||
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
||||
|
ONGC
|
22766.00
|
1931.11
|
1904.60
|
1895.70
|
100.47
|
16872.80
|
16629.09
|
16879.30
|
98.52
|
|
OIL
|
3480.00
|
312.41
|
280.59
|
270.12
|
103.87
|
2513.21
|
2430.46
|
2450.61
|
99.18
|
|
PSC
Fields
|
10839.32
|
911.03
|
869.89
|
913.85
|
95.19
|
8189.45
|
7985.79
|
8617.95
|
92.66
|
|
Total
|
37085.32
|
3154.55
|
3055.07
|
3079.67
|
99.20
|
27575.46
|
27045.34
|
27947.86
|
96.77
|
*: Provisional
Figure-1: Monthly
Crude Oil Production
Unit-wise
production details with reasons for shortfall have been given in following
sub-sections:
1.1
Crude
oil production by ONGC during December, 2016 was 1904.60 TMT which is 1.37% lower
than the monthly target but 0.47% higher when compared with December 2015.
Cumulative crude oil production by ONGC during April-December, 2016 was 16629.09
TMT which is 1.44% lower than target for the period and 1.48% lower than production
during corresponding period of last year. Shortfall in production was mainly
due to less than planned production from marginal fields of Mumbai High and
natural decline in matured fields of western offshore.
1.2
Crude
oil production by OIL during December, 2016 was 280.59 TMT which is 10.18% lower
than monthly target but 3.87% higher than production in December 2015. Cumulative
crude oil production by OIL during April-December, 2016 was 2430.46 TMT which
is 3.29% lower than target for the period and 0.82% lower than production
during corresponding period of last year. Shortfall in production was mainly
due to less than planned contribution from high
producing areas like Greater Hapjan, Greater Chandmari fields & Naharkatiya
fields on account of rise in water cut and less than envisaged contribution from
newly drilled wells.
1.3
Crude
oil production by Pvt/JVs during December 2016 was 869.89 TMT which is 4.52% lower
than the monthly target and 4.81% lower than December, 2015. Cumulative crude
oil production by Pvt/JVs during April-December, 2016 was 7985.79 TMT which is 2.49%
lower than target for the period and 7.34% lower than the production during
corresponding period of last year. Reasons for shortfall in production are as
under:
Ø RJ-ON-90/1:
Plant tripped on 16.12.16, stopping production from Mangala & Aishwarya.
Increase in water cut in Mangala wells, poor reservoir performance of Bhagyam
Ø Natural
Decline in Ravva & CB-OS/2
Ø Closure
of 1 well in MA field in KG-DWN-98/3
Natural Gas
2
Natural
gas production during December 2016 was 2736.80 MMSCM which is 9.68% lower than
the target for the month and 0.01% lower than the production in December 2015.
Cumulative natural gas production during April-December, 2016 was 23885.34 MMSCM
which is 5.04% lower than target for the period and 3.29% lower than the
production during corresponding period of last year. Unit-wise and state-wise
natural gas production is given at Annexure-II. Unit-wise
natural gas production for the month of December, 2016 and cumulatively for the
period April-December, 2016 vis-à-vis same period of last year has been shown
in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (MMSCM)
|
Oil Company
|
Target
|
December (Month)
|
April-December (Cumulative)
|
||||||
|
2016-17 (Apr-Mar)
|
2016-17
|
2015-16
|
% over last year
|
2016-17
|
2015-16
|
% over last year
|
|||
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
||||
|
ONGC
|
22743.43
|
2040.57
|
1926.75
|
1818.99
|
105.92
|
16724.08
|
16420.24
|
16272.14
|
100.91
|
|
OIL
|
2950.03
|
246.84
|
246.50
|
266.10
|
92.63
|
2260.52
|
2211.56
|
2120.06
|
104.32
|
|
PSC
Fields
|
8425.44
|
742.87
|
563.56
|
651.89
|
86.45
|
6167.70
|
5253.54
|
6304.94
|
83.32
|
|
Total
|
34118.90
|
3030.28
|
2736.80
|
2736.98
|
99.99
|
25152.31
|
23885.34
|
24697.14
|
96.71
|
*: Provisional
Figure-2: Monthly Natural
Gas Production
2.1
Natural
gas production by ONGC during December, 2016 was 1926.75 MMSCM which is 5.58% lower
than the monthly target but 5.92% higher when compared with December 2015. Cumulative
natural gas production by ONGC during April-December, 2016 was 16420.24 MMSCM
which is 1.82% lower than the cumulative target but 0.91% higher than the
production during the corresponding period of last year. Shortfall in
production was mainly due to decline in reservoir pressure in Bassein field and
less production from Daman & C-26 Cluster due to evacuation constraint as
export lines to TCPP platform is not yet completed.
2.2
Natural
gas production by OIL during December, 2016 was 246.50 MMSCM which is 0.14% lower
than the monthly target and 7.37% lower than December 2015. Cumulative natural
gas production by OIL during April-December, 2016 was 2211.56 MMSCM which is 2.17%
lower than the cumulative target but 4.32% higher than the production during
the corresponding period of last year. Shortfall in
production was mainly due to decline production potential in a few high
producing gas wells due to unexpected subsurface problems like water and sand
ingress.
2.3
Natural gas production by Pvt/JVs during December 2016 was 563.56 MMSCM
which is 24.14% lower than the monthly target and 13.55% less when compared
with December, 2015. Cumulative natural gas production by Pvt/JVs during April-December,
2016 was 5253.54 MMSCM which is 14.82% lower than the cumulative target and 16.68%
lower than the production during the corresponding period of last year. Reasons
for shortfall in production are as under:
Ø Underperformance
of wells in KG- OSN-2001/3.
Ø Underperformance
of Sohagpur West CBM block extended dewatering hampering production in Raniganj
East CBM block.
Ø Closure
of 2 wells in D1D3 field in KG-DWN-98/3.
Ø RJ-ON-90/1:
Plant tripped on 16.12.16, stopping production from Mangala & Aishwarya.
Increase in water cut in Mangala wells, poor reservoir performance of Bhagyam.
Ø RJ-ON/6:
Increase in Water cut in few wells.
Refinery Production (in terms of Crude
oil processed)
3
Refinery
production during December, 2016 was 21441.47 TMT which is 3.21%
higher than the target for the month and 6.43% higher than the production during
corresponding period of last year. Cumulative production during April-December,
2016 was 183886.03 TMT which is 2.16% higher than the target for the period and
7.82% higher than the production during corresponding period of last year.
Unit-wise production is given at Annexure-III. Company-wise production for the
month of December, 2016 and cumulatively for the period April-December, 2016
vis-à-vis same period of last year has been shown in Table-3 and month-wise in
Figure-3.
Table 3: Refinery Production (TMT)
|
Oil Company
|
Target
|
December (Month)
|
April-December (Cumulative)
|
||||||
|
2016-17 (Apr-Mar)
|
2016-17
|
2015-16
|
% over last year
|
2016-17
|
2015-16
|
% over last year
|
|||
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
||||
|
PSUs
|
135565.03
|
11662.78
|
12098.44
|
10848.04
|
111.53
|
101443.29
|
102756.76
|
91957.50
|
111.74
|
|
IOCL
|
65100.00
|
5570.12
|
5682.22
|
4917.90
|
115.54
|
48452.12
|
48103.96
|
41673.52
|
115.43
|
|
BPCL
|
25250.15
|
1918.14
|
2307.73
|
2085.02
|
110.68
|
18608.79
|
19338.98
|
17931.32
|
107.85
|
|
HPCL
|
16800.29
|
1493.00
|
1620.20
|
1564.69
|
103.55
|
12735.45
|
13195.83
|
12534.06
|
105.28
|
|
CPCL
|
10250.00
|
934.81
|
747.45
|
520.89
|
143.49
|
8291.60
|
8166.69
|
6811.46
|
119.90
|
|
NRL
|
2670.00
|
267.67
|
257.01
|
229.21
|
112.13
|
2027.50
|
1960.56
|
1847.18
|
106.14
|
|
MRPL
|
15450.00
|
1475.00
|
1476.64
|
1523.24
|
96.94
|
11295.00
|
11927.50
|
11114.26
|
107.32
|
|
ONGC
|
44.59
|
4.05
|
7.19
|
7.08
|
101.55
|
32.83
|
63.23
|
45.70
|
138.36
|
|
JVs
|
15000.00
|
1321.02
|
1570.99
|
1436.55
|
109.36
|
11486.44
|
12696.91
|
12919.50
|
98.28
|
|
BORL
|
6000.00
|
525.00
|
623.73
|
501.65
|
124.34
|
4425.00
|
4677.93
|
4660.25
|
100.38
|
|
HMEL
|
9000.00
|
796.02
|
947.25
|
934.91
|
101.32
|
7061.44
|
8018.99
|
8259.25
|
97.09
|
|
Private
|
89852.65
|
7790.78
|
7772.04
|
7861.27
|
98.87
|
67064.48
|
68432.36
|
65666.43
|
104.21
|
|
RIL
|
69561.01
|
6080.79
|
5994.99
|
6080.79
|
98.59
|
51788.53
|
52641.83
|
51788.53
|
101.65
|
|
EOL
|
20291.64
|
1709.99
|
1777.05
|
1780.48
|
99.81
|
15275.94
|
15790.54
|
13877.90
|
113.78
|
|
TOTAL
|
240417.68
|
20774.58
|
21441.47
|
20145.86
|
106.43
|
179994.20
|
183886.03
|
170543.44
|
107.82
|
*:
Provisional
Figure 3: Monthly Refinery
Production
3.1
PSU Refineries’ production during December, 2016 was 12098.44 TMT which is 3.74%
higher than the target for the month and 11.53% higher than the production
achieved in the corresponding month of last year. Cumulative
production by PSU refineries during April-December, 2016 was 102756.76 TMT
which is 1.29% higher than the target for the period and 11.74% higher than the
production during corresponding period of last year. Reasons for shortfall of
refinery production in some PSU refineries are as under:
v IOCL,
Paradip: Throughput lower due to coke upliftment issue.
v IOCL,
Haldia: Throughput is lower due to VGO stock build-up
v IOCL,
Guwahati/Digboi: Lower availability of Assam crude.
v
CPCL,
Manali: Throughput of Manali Refinery lower than target due to 'Vardha' cyclone
which hit the refinery on 12th Dec'16 and lead to water crises as
all water sources were temporally shutdown.
v CPCL,
CBR: Lower throughput in CBR due to product evacuation constraints.
v NRL,
Numaligarh: Unplanned shutdown of DCU.
3.2 Production
in JV refineries during December, 2016 was 1570.99 TMT which is 18.92% higher
than the target for the month and 9.36% higher than the production achieved in
the corresponding month of last year. Cumulative production by
JVs refineries during April-December, 2016 was 12696.91 TMT which is 10.54%
higher than the target for the period but 1.72% lower than the production
during corresponding period of last year.
3.3 Production
in private refineries during December, 2016 was 7772.04 TMT which is 0.24% lower
than the target for the month and 1.13% lower than the production achieved in
the corresponding month of last year. Cumulative production by
private refineries during April-December, 2016 was 68432.36 TMT which is 2.04%
higher than the target for the period and 4.21% higher than the production
during corresponding period of last year.
3.4 Refinery-wise
details of the capacity utilization and production of petroleum products during
the month of December, 2016 and cumulatively for the period April-December, 2016
vis-à-vis April-December, 2015 are given at Annexures-IV and V respectively.

Post a Comment